{"slug":"ef-openceda-electric_power-qa-usd-cradle_to_gate-327c60bb","library":"openceda","source_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b","activity_full":"Electric power generation, transmission, and distribution","activity_full_stored":null,"description":null,"description_origin":null,"description_lang":null,"our_note":null,"included_processes":null,"included_processes_origin":null,"included_processes_lang":null,"applicability":null,"applicability_origin":null,"applicability_lang":null,"category_code":"electricity","category":"Electricity","category_label":"Electricity","sub_category_code":"electricity_grid_mix","sub_category":"Grid-mix electricity","sub_category_label":"Grid-mix electricity","subject_kind":"grid_energy","classifications":[{"scheme":"bea_2017","code":"221100","label":"Electric power generation, transmission, and distribution","level":3,"parent_code":null},{"scheme":"ceda_sector","code":"221100","label":"Electric power generation, transmission, and distribution","level":1,"parent_code":null},{"scheme":"open_ef_category","code":"electricity","label":"Electricity","level":1,"parent_code":null},{"scheme":"open_ef_category","code":"electricity_grid_mix","label":"Grid-mix electricity","level":2,"parent_code":"electricity"}],"region_code":"QA","region_label":"Qatar","region_is_publisher_default":false,"unit_code":"usd","original_unit_code":null,"fx_ratio":null,"unit_label":"USD","unit_family":"monetary","system_boundary":"cradle_to_gate","system_boundary_label":"Cradle to gate","boundary_family":"lifecycle","boundary_scope":{"capital_goods":"in","upstream_fuel":"in","infrastructure":"not_stated","business_travel":"in","fuel_combustion":"in","employee_commuting":"out","overheads_services":"in","purchased_electricity":"in"},"boundary_scope_source":{"capital_goods":"library","upstream_fuel":"boundary","infrastructure":"boundary","business_travel":"library","fuel_combustion":"boundary","employee_commuting":"library","overheads_services":"library","purchased_electricity":"boundary"},"boundary_profile":null,"lifecycle_coverage":{"upstream":"full","production":"full","downstream":"none","eol":"none","role":"whole","preset":"cradle_to_gate"},"parent_slug":null,"parent_label":null,"parent_relation":null,"part_label":null,"root_slug":"ef-openceda-electric_power-qa-usd-cradle_to_gate-327c60bb","child_slugs":[],"is_top_parent":true,"is_derived":false,"estimated":false,"supplier_name":null,"supplier_code":null,"data_type":"average","is_epd":false,"has_supplier":false,"value_co2e":18.255069857321843,"co2e_basis":"io_total","co2e_origin":"source","ghg_breakdown":null,"gwp_method":"ar6","gwp_horizon_years":100,"method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"reference_year":2023,"applies_from_year":2025,"applies_to_year":2025,"data_quality_normalized":"low","data_quality_reason_normalized":"library_prior","data_quality_reason_missing":false,"license_tier":"copyleft","license_code":"cc-by-sa-4.0","attribution_text":"Open CEDA 2025 by Watershed, CC BY-SA 4.0.","license_url":"https://creativecommons.org/licenses/by-sa/4.0/","license_notice":null,"value_withheld":false,"withheld_for_quality":null,"depth":"full","matrix":{"shape":{"combination_count":11,"year_min":2015,"year_max":2025,"year_first":2015,"year_last":2025,"open_start":false,"open_end":false,"methodologies":["ar6"],"default_methodology":"ar6"},"values":[{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2025","applies_from_year":2025,"applies_to_year":2025,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":18.255069857321843,"value_withheld":false,"is_default":true,"is_latest_activity_year":true,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2025","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2024","applies_from_year":2024,"applies_to_year":2024,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":17.680031933190577,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2024","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2023","applies_from_year":2023,"applies_to_year":2023,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"printed","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":17.41181244,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2023","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2022","applies_from_year":2022,"applies_to_year":2022,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":15.549883385976312,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2022","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2021","applies_from_year":2021,"applies_to_year":2021,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":19.57371294565064,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2021","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2020","applies_from_year":2020,"applies_to_year":2020,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":23.971148488521397,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2020","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2019","applies_from_year":2019,"applies_to_year":2019,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":20.351404473148836,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2019","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2018","applies_from_year":2018,"applies_to_year":2018,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":19.444564741167973,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2018","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2017","applies_from_year":2017,"applies_to_year":2017,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":21.858489860534952,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2017","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2016","applies_from_year":2016,"applies_to_year":2016,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":23.560735269266637,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2016","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}},{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2015","applies_from_year":2015,"applies_to_year":2015,"methodology":"ar6","method_tokens":[{"kind":"gwp_method","code":"ar6","value":null},{"kind":"gwp_horizon","code":"gwp100","value":"100"},{"kind":"price_basis","code":"producer","value":null},{"kind":"currency_year","code":"currency_year","value":"2023"}],"gwp_method":"ar6","gwp_horizon_years":100,"calculation_approach":null,"radiative_forcing":null,"grid_mix":null,"co2e_basis":"io_total","co2e_origin":"source","grid_mix_origin":null,"price_basis":"producer","currency_year":2023,"price_year_origin":"price_index","value_qualifiers":null,"original_unit_code":null,"fx_ratio":null,"value_co2e":21.445758510743026,"value_withheld":false,"is_default":true,"is_latest_activity_year":false,"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2015","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}}]},"parts":[],"ghg_scopes":[{"reporter_role":"energy_buyer","is_default_role":true,"slot":"scope_2","scope":2,"category":null,"reporting_moment":"this_period","applies_when":null},{"reporter_role":"energy_buyer","is_default_role":true,"slot":"scope_3_3","scope":3,"category":3,"reporting_moment":"this_period","applies_when":null},{"reporter_role":"operator","is_default_role":false,"slot":"scope_1","scope":1,"category":null,"reporting_moment":"this_period","applies_when":null},{"reporter_role":"operator","is_default_role":false,"slot":"scope_3_3","scope":3,"category":3,"reporting_moment":"this_period","applies_when":null},{"reporter_role":"grid_owner","is_default_role":false,"slot":"scope_2","scope":2,"category":null,"reporting_moment":"this_period","applies_when":null},{"reporter_role":"grid_owner","is_default_role":false,"slot":"scope_3_3","scope":3,"category":3,"reporting_moment":"this_period","applies_when":null}],"ghg_reporter_roles":["energy_buyer","operator","grid_owner"],"passport":{"value_key":"efv1-efb3919bdf89bbc1daca021ad3b6bd2b_2025","source_native_id":"221100|QAT","source_native_id_kind":"ceda_sector_country","source_status":null,"source_link":"https://openceda.org","release_version":"CEDA 2025","released_on":"2025-11-11","publisher_valid_from":null,"publisher_valid_to":null,"activity_raw":"Electric power generation, transmission, and distribution","region_raw":"QAT","unit_raw":"kgCO2e/US Dollar (producer price)","system_boundary_raw":null,"publisher_sector":"Electric power generation, transmission, and distribution","publisher_sub_sector":null,"unit_conversion_factor":1.0,"region_origin":"source","system_boundary_origin":"assigned","gwp_origin":"inferred","characterization_model":null,"gwp_method_native":"ar6","gwp_normalization_basis":"native","value_co2e_native":null,"data_quality_rating_native":null,"data_quality_scheme_native":null,"value_withheld":false}}