Emission factor from ITB EPD Program (Instytut Techniki Budowlanej) EPD, industry average

Vertua® concrete groups (based on mix CEM I and CEM III) produced by Cemex Polska

World · EPD total · Reference year 2021

Each kilogram of this product counts as 0.0979 kg CO₂e over the modules its EPD declares: 0.0176 to make it (A1–A3) and 0.0803 at end of life.

Value per kilogram, over the modules the EPD declares

0.0979kgCO₂e/kg

EN 15804 modules A1 to A3 · Net total: fossil, biogenic and land use · GWP100 · AR5

Derived by open-climate.ai: the sum of ITB EPD's published parts

The one scenario this EPD declaresReference year 2021

Region
World GLOBAL
Boundary
EPD total
Data quality
MediumRated by us, not by the source
Licence
Open · ITB EPD terms
Declared by
CEMEX Polska Sp. z o.o.
Declared unit
Served per kilogram ÷ 1,000

Where 0.0979 comes from

Derived by open-climate.ai

Σ 0.0979: the two declared modules add up to the total. D stays beside it.

Reporting this kilogram under the GHG Protocol

This period

Scope 3, category 1 0.0176

You buy the product for a building that is not yours. The product and its installation go to category 1, the delivery to category 4. The use stage belongs to the building owner; demolition waste you handle is category 5.

Later, when it happens

At end of life, in the year of demolition

  • End of life Scope 3, category 5 0.0803

Outside the scopes, reported separately

  • D −0.0207

A4, A5, B1 to B7 and C1 to C4 are not declared: nothing to report.

CiteAPI

The factor, standardised

Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.

Materials › Minerals and aggregates · World · per kg · Average

EPD total · Net total · AR5

Boundary
EPD total
Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging, purchased energy and end of life
GWP method
IPCC AR5, 100-year horizon
Not on the record; set from ITB EPD's method notes · impact method EF 3.0
CO₂e basis
Net total
Not split by gas; CO₂e only
Life cycle
Upstream: coveredProduction: coveredDownstream: not coveredEnd of life: partly covered

Medium quality · Open licence · Any year

Module by module, up to the total

Seventeen EN 15804 modules, always in the same order. Each declared one moves the running total. D sits below zero after the total, because it is reported beside it.

kgCO₂e per kilogram. Each bar starts where the one before ended. Pick a module to read it.
Product
Con­struc­tion
A4 to A5not de­clared
Use
B1 to B7not de­clared
End of life
Beyond the boundary

beside the total, not in it

Scenarios and units

Some EPDs price a module under several scenarios, such as different end-of-life routes. Each gets a tab, and each module's default is marked.

This factor

One scenario, as declared

Every module has one value, so there is nothing to choose.

  • Per t, as declared97.93
  • Per kilogram, served0.09793

What this number covers

Follow one kilogram of this product through EN 15804's stages. The total counts what the EPD declares; what it leaves out stays visible.

  1. A1-A3Product

    Materials and making the product

    Included0.0176
  2. A4-A5Construction

    Delivery and installation

    Not declared
  3. B1-B7Use

    The product in service: maintenance, repair, replacement and the energy and water it uses

    Not declared
  4. C1-C4End of life

    From demolition to disposal

    Included0.0803
  5. DBeyond the boundary

    Recovery after end of life

    Not in the total−0.0207

Outside this boundary

  • Installation
  • Maintenance
  • Outbound transport
  • Retail
  • Use phase
  • Recycling credit

Maintenance is out because B2 is not declared. The recycling credit is module D, shown beside the total.

Gases

ITB EPD publishes this factor as CO₂e only, with no split by gas. The CO₂e counts fossil, biogenic and land-use carbon together.

From ITB EPD's record to a comparable factor

ITB EPD publishes this EPD as one declared value. Each field as printed, and what open-climate.ai made of it.

The total and its modules

Use a module on its own when you report it in a different year or scope; never add one to the total.

You are here · the EPD total0.0979
D beside−0.0207
The two modules add up to the total; D stays beside it. Each opens its own page.

About this factor

From ITB EPD

What it is

The values determined to calculate A1 (cement) and A3 originate from verified CEMEX LCI inventory data. A1 values (raw materials) were prepared considering specific EPDs, Ecoinvent data and economic allocation data processed for ashes. The allocation rules used for this EPD are based on general requirements provided in ITB PCR A and EN 15804. As no co-products are produced, the flow of materials and energy and the associated release of substances and energy into the environment are related exclusively to the concrete mix produced. Cements (produced by 3 cement plants of CEMEX in Poland) were used identified as the weighted average mass of production for each plant. In the case of fly ash, eco-product from electricity production used as a cement constituent, economic allocation was applied. Minimum 99.5% of impacts from the production lines were allocated to product covered by this declaration. Emissions allocated in clinker/cement production (module A1) are assessed using international methods for ETS system declaration. The specific prices for fly ash declared by the producer were used for the economic allocation. Calculations for GWP indicator are made taking into account gross and net emissions. The indicated gross value includes the CO2 emissions from waste incineration (excluding biomass fraction of fuels), net-value excluding impacts from alternative waste-based fuels. In this assessment, all information gathered from data collection for the production of concrete has been modelled, i.e. all raw materials used, the electrical energy and other fuels used, use of ancillary materials and all direct production waste. Transport data on input was considered. No cut-offs have been made in accordance with EN 15804. The machines and facilities (capital goods) required for and during production are excluded, as is transportation of employees. Calculations for GWP indicator are made taking into account gross and net emissions.

Where it applies

Concrete is specified and supplied in accordance with EN 206. Delivered to site on a just-in-time basis, mixed concrete may be cast into any conceivable shape with almost no limit on volume. When hardened, concrete can carry substantial compressive loads by itself, but is more frequently reinforced to substantially increase its tensile and flexural strength. Concrete is used for site-mixed structures, precast structures and structural precast products in buildings prefabricated structures and structural prefabricated products in buildings and buildings. Cemex products specified in accordance with the documents: PN-EN 206, PN-S-9612, PN-EN 14227-1, PN-EN 14227-3, PN-EN 14227-5, PN-EN 998-2 and National Technical Assessments of Cemex products cited on the website www.cemex.com

Source and licence

Value
Summed by open-climate.ai from its parts
Publisher
ITB EPD
Published
2 October 2026
Valid until
31 December 2026
See the source data at ITB EPD

The values and their metadata are served in full and may be reused with credit to the publisher.

Credit it with this lineITB EPD Program, programme operator Instytut Techniki Budowlanej (ITB), EPD data from https://itb.lca-data.com
A plain reading of the licence, not legal advice. The licence text prevails.

Cite this factor

ITB EPD Program, programme operator Instytut Techniki Budowlanej (ITB), EPD data from https://itb.lca-data.com. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/itb_epd/ (CC BY 4.0). https://open-climate.ai/factors/ef-itbepd-vertua_concrete_groups-global-kg-epd_total-675c09f3/?v=efv1-269db091222ef70f3165b5276e6a1151

Something looks wrong?

Tell us which value and why. We check it against the source and answer within a week.