Value per kilogram, over the modules the EPD declares
0.782kgCO₂e/kg
EN 15804 modules A1 to A3 · Net total: fossil, biogenic and land use · GWP100 · AR4
The one scenario this EPD declaresReference year 2020
- Region
- Netherlands NL
- Boundary
- Cradle to gate
- Data quality
- MediumRated by us, not by the source
- Licence
- Open · MRPI terms
- Declared by
- ENCI B.V.
- Declared unit
- 1 kg, served per kilogram ÷ 1,000
Where 0.782 comes from
- Scope 3, cat. 10.01121.4%
- Scope 3, cat. 10.004790.6%
- Scope 3, cat. 10.76698%
Σ 0.78199: the three parts add up to MRPI's total, which it prints as 0.782.
Reporting this kilogram under the GHG Protocol
Scope 3, category 1 0.782
You buy the product for a building that is not yours. The product and its installation go to category 1, the delivery to category 4. The use stage belongs to the building owner; demolition waste you handle is category 5.
A4, A5, B1 to B7 and C1 to C4 are not declared: nothing to report.
The factor, standardised
Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.
Materials › Minerals and aggregates · Netherlands · per kg · Average
Cradle to gate · Net total · AR4
- BoundaryCradle to gateExtraction of raw materials through production, up to the producer's factory gate. Learn more
- Cradle to gate
- Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging and purchased energy
- GWP methodWhich IPCC assessment report's warming potentials convert each gas to CO₂e, and over how many years the warming is counted (GWP100: 100 years). Learn more
- IPCC AR4, 100-year horizon
- Not on the record; set from MRPI's method notes · impact method CML 2001 baseline
- CO₂e basisWhich carbon the CO₂e counts. Fossil only leaves out biogenic CO₂ and land use; net total counts every pool, net of removals. The same activity on two bases is two different numbers. Learn more
- Net total
- Not split by gas; CO₂e only
- Life cycle
- Upstream: coveredProduction: coveredDownstream: not coveredEnd of life: not covered
Medium quality · Open licence · Any year
Module by module, up to the total
Seventeen EN 15804 modules, always in the same order. Each declared one moves the running total.
| Module | Name | Per kilogram | Per kg as declared | Running total | Status |
|---|---|---|---|---|---|
| A1 | Raw material supply | 0.0112 | 11.2 | 0.0112 | Declared |
| A2 | Transport to the plant | 0.00479 | 4.79 | 0.01599 | Declared |
| A3 | Manufacturing | 0.766 | 766 | 0.78199 | Declared |
| A4 | Transport to site | not declared | 0.78199 | Not declared | |
| A5 | Installation | not declared | 0.78199 | Not declared | |
| B1 | Use | not declared | 0.78199 | Not declared | |
| B2 | Maintenance | not declared | 0.78199 | Not declared | |
| B3 | Repair | not declared | 0.78199 | Not declared | |
| B4 | Replacement | not declared | 0.78199 | Not declared | |
| B5 | Refurbishment | not declared | 0.78199 | Not declared | |
| B6 | Energy in use | not declared | 0.78199 | Not declared | |
| B7 | Water in use | not declared | 0.78199 | Not declared | |
| C1 | Demolition | not declared | 0.78199 | Not declared | |
| C2 | Waste transport | not declared | 0.78199 | Not declared | |
| C3 | Waste processing | not declared | 0.78199 | Not declared | |
| C4 | Disposal | not declared | 0.78199 | Not declared | |
| Total | EPD total, declared modules | 0.782 | 782 | Sum of the declared modules | |
| D | Beyond the system boundary | not declared | not added | Not declared |
Scenarios and units
Some EPDs price a module under several scenarios, such as different end-of-life routes. Each gets a tab, and each module's default is marked.
One scenario, as declared
Every module has one value, so there is nothing to choose.
- Per kg, as declared782
- Per kilogram, served0.782
What this number covers
Follow one kilogram of this product through EN 15804's stages. The total counts what the EPD declares; what it leaves out stays visible.
A1-A3Product
Materials and making the product
Included0.782A4-A5Construction
Delivery and installation
Not declaredB1-B7Use
The product in service: maintenance, repair, replacement and the energy and water it uses
Not declaredC1-C4End of life
From demolition to disposal
Not declaredDBeyond the boundary
Recovery after end of life
Not declared
Outside this boundary
- Installation
- Maintenance
- Outbound transport
- Retail
- Use phase
- End of life
- Recycling credit
Maintenance is out because B2 is not declared.
Gases
MRPI publishes this factor as CO₂e only, with no split by gas. The CO₂e counts fossil, biogenic and land-use carbon together.
From MRPI's record to a comparable factor
MRPI publishes this EPD per kg, with one value per module. Each field as printed, and what open-climate.ai made of it.
The total and its modules
Use a module on its own when you report it in a different year or scope; never add one to the total.
About this factor
From MRPI
What it is
Portland cement, clinker content between 95 and 100%wt. Scope and type: Cement is a hydraulic binder, mainly used for concrete, mortar and cement screed. Since it is semi-finished product, in this EPD only the product stage is included. The environmental data in this EPD represents an average of cement produced at the product locations of HeidelbergCement in the Netherlands, Belgium and Germany and supplied on the Dutch market. Representativeness: The data on this EPD is representative for the production on multiple locations based on the weighted average of product sold on the Dutch market. The environmental data in this EPD represents an average of cement produced at the production locations of Heidelberg Cement in: - Lixhe - Maastricht Calculation rules: Virtually no materials or processes have been excluded from the study cut-of rule is well below 1%. Refractories, grinding media and grinding aids are included. Primary data at the production locations of HeidelbergCement where collected in 2019-2020 from base year 2018. The “production” of secondary fuels and materials is allocated to the previous life cycle. Transportation to the production site of heidelbergCement is allocated to the production of cement. Also, the emissions from the combustion of secondary fuels for clinker production are allocated to the cement production. Biogenic CO2 emissions are not included. The LCA calculations are made using the Ecoinvent database v3.4. Infrastructure processes in Ecoinvent processes have been included, long term emissions in Ecoinventprocesses have been excluded from the LCA calculations. Scenarios and additional technical information: Module A1: This module includes the supply of raw materials and fuels. Module A2: This module includes the transport of raw materials and fuels to the cement plant. Module A3: This module includes the grinding of the raw materials, the production of the clinker and the processing and blending of the cement constituents. Declaration of SVHC: No substances that are listed in the latest ”Candidate List of Substances of Very High Concern for authorisatio” are included in the product that exceeds the limit for registration. More information: www.enci.nlWhat it includes
Cement is produced by intergrinding Portland cement clinker and other constituents. In this EPD only the production of bulk cement is considered. Packaging materials are not included. COMPONENT > 1% [kg / %] Portland cement clinker 95 - 100 Minor additional constituents 0 - 5 * > 1% of total massSource and licence
- Publisher
- MRPI (Stichting MRPI)
- Library
- MRPI MRPI_2026-10-02
- Record
- 1c0362d2-31b1-4c93-ba46-2225f64cc0f1
- Published
- 2 October 2026
- Valid until
- 31 December 2025
- Status
- Average dataset
The values and their metadata are served in full and may be reused with credit to the publisher.
Cite this factor
MRPI (Stichting MRPI), EPD data from https://data.mrpi.nl. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/mrpi/ (CC BY 4.0). https://open-climate.ai/factors/ef-mrpi-cem_i_425_n-nl-kg-cradle_to_gate-3d0b3aa0/?v=efv1-e6751b5a21aaad2ee0f2e1ba489a62c0
Something looks wrong?
Tell us which value and why. We check it against the source and answer within a week.