Emission factor from EPD Italy EPD, product-specific
Concrete produced in the Fossano (CN) plant: Ordinary Concrete U25 - CAM5
Italy · EPD total · Reference year 2025
Each litre of this product counts as 0.271 kg CO₂e over the modules its EPD declares: 0.248 to make it (A1–A3), 0.00566 to deliver and place it (A4) and 0.0176 at end of life.
Value per litre, over the modules the EPD declares
0.271kgCO₂e/L
EN 15804 modules A1 to A4 · Fossil only · GWP100 · AR5
Derived by open-climate.ai: the sum of EPD Italy's published parts
The one scenario this EPD declaresReference year 2025
- Region
- Italy IT
- Boundary
- EPD total
- Data quality
- HighRated by us, not by the source
- Licence
- Open · EPD Italy terms
- Declared by
- UNICAL S.p.A.
- Declared unit
- Served per litre ÷ 1,000
Where 0.271 comes from
- A1-A3 Product stageScope 3, cat. 10.24891.4%
- Scope 3, cat. 40.005662.1%
- End of lifeDerived by open-climate.aiScope 3, cat. 50.01766.5%
- Outside the scopes−0.00367beside
Σ 0.271: the three declared modules add up to the total. D stays beside it.
Reporting this litre under the GHG Protocol
This period
Scope 3, category 1 0.248 Scope 3, category 4 0.00566
You buy the product for a building that is not yours. The product and its installation go to category 1, the delivery to category 4. The use stage belongs to the building owner; demolition waste you handle is category 5.
Later, when it happens
At end of life, in the year of demolition
- End of life Scope 3, category 5 0.0176
Outside the scopes, reported separately
- D −0.00367
A5, B1 to B7 and C1 to C4 are not declared: nothing to report.
The factor, standardised
Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.
Materials › Minerals and aggregates · Italy · per L · Supplier-specific
EPD total · Fossil only · AR5
- BoundaryEPD totalThe sum of every EN 15804 module an EPD declares, when that set is not the complete A-C grid (MOD-0034). Learn more
- EPD total
- Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging, purchased energy, outbound transport and end of life
- GWP methodWhich IPCC assessment report's warming potentials convert each gas to CO₂e, and over how many years the warming is counted (GWP100: 100 years). Learn more
- IPCC AR5, 100-year horizon
- Not on the record; set from EPD Italy's method notes · impact method EF 3.0
- CO₂e basisWhich carbon the CO₂e counts. Fossil only leaves out biogenic CO₂ and land use; net total counts every pool, net of removals. The same activity on two bases is two different numbers. Learn more
- Fossil only
- Split by carbon origin, not by gas
- Life cycle
- Upstream: coveredProduction: coveredDownstream: partly coveredEnd of life: partly covered
High quality · Open licence · Any year
Module by module, up to the total
Seventeen EN 15804 modules, always in the same order. Each declared one moves the running total. D sits below zero after the total, because it is reported beside it.
beside the total, not in it
| Module | Name | Per litre | Per m³ as declared | Running total | Status |
|---|---|---|---|---|---|
| A1-A3 | Product stage | 0.248048 | 248.048 | 0.248048 | Declared |
| A4 | Transport to site | 0.00566177 | 5.66177 | 0.25371 | Declared |
| A5 | Installation | not declared | 0.25371 | Not declared | |
| B1 | Use | not declared | 0.25371 | Not declared | |
| B2 | Maintenance | not declared | 0.25371 | Not declared | |
| B3 | Repair | not declared | 0.25371 | Not declared | |
| B4 | Replacement | not declared | 0.25371 | Not declared | |
| B5 | Refurbishment | not declared | 0.25371 | Not declared | |
| B6 | Energy in use | not declared | 0.25371 | Not declared | |
| B7 | Water in use | not declared | 0.25371 | Not declared | |
| C1 | Demolition | 0.00963492 | 9.63492 | 0.263345 | Declared |
| C2 | Waste transport | 0.00715949 | 7.15949 | 0.270504 | Declared |
| C3 | Waste processing | 0.000761336 | 0.761336 | 0.271266 | Declared |
| C4 | Disposal | 0.00000530756 | 0.00530756 | 0.271271 | Declared |
| Total | EPD total, declared modules | 0.271271 | 271.271 | Sum of the declared modules | |
| D | Beyond the system boundary | −0.00366948 | −3.66948 | not added | Beside the total, not in it |
Scenarios and units
Some EPDs price a module under several scenarios, such as different end-of-life routes. Each gets a tab, and each module's default is marked.
One scenario, as declared
Every module has one value, so there is nothing to choose.
- Per m³, as declared271.271
- Per litre, served0.271271
What this number covers
Follow one litre of this product through EN 15804's stages. The total counts what the EPD declares; what it leaves out stays visible.
A1-A3Product
Materials and making the product
Included0.248A4-A5Construction
Transport to site only; A5 not declared
A4 only0.00566B1-B7Use
The product in service: maintenance, repair, replacement and the energy and water it uses
Not declaredC1-C4End of life
From demolition to disposal
Included0.0176DBeyond the boundary
Recovery after end of life
Not in the total−0.00367
Outside this boundary
- Installation
- Maintenance
- Retail
- Use phase
- Recycling credit
Maintenance is out because B2 is not declared. The recycling credit is module D, shown beside the total.
Gases
- Fossil CO₂e0.271
- Biogenic CO₂e0.000068
- Land-use CO₂e0.0000105
The total counts fossil CO₂e. EPD Italy reports biogenic and land-use CO₂e separately; they are shown beside it, not added.
From EPD Italy's record to a comparable factor
EPD Italy publishes this EPD with one value per module. Each field as printed, and what open-climate.ai made of it.
The total and its modules
Use a module on its own when you report it in a different year or scope; never add one to the total.
About this factor
From EPD Italy
What it is
1 m3 concrete Unical feeds the EPD process annually with primary data related to the manufacture of each product; any primary data of external origin are instead subject to validation by the Ecology Environment and Safety Service Buzzi Unicem S.r.l. Finally, third-party verification certifies the overall reliability of the EPD process. In cases where allocation cannot be avoided, the phenomenon is handled in accordance with the relevant ISO standards (14040, 14044); in such cases, bulk allocation is adopted. < 1% mass and energyWhere it applies
Ready mix concrete Ordinary Concrete U25 - CAM5Source and licence
- Value
- Summed by open-climate.ai from its parts
- Publisher
- EPD Italy (ICMQ)
- Published
- 2 October 2026
- Valid until
- 31 December 2030
The values and their metadata are served in full and may be reused with credit to the publisher.
Cite this factor
EPD Italy (ICMQ), EPD data from https://epditaly.lca-data.com. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/epd_italy/ (CC BY 4.0). https://open-climate.ai/factors/ef-epditaly-concrete_produced_in_the-it-l-epd_total-6267bc9d/?v=efv1-1cb9764841ad9cf1e50d7a838977a36f
Something looks wrong?
Tell us which value and why. We check it against the source and answer within a week.