Emission factor from Statens vegvesen v6.03
Railway: Superstructure and railway engineering - tunnel, lm double track
Norway · Cradle to gate · Any year
Value for any year
1,595kgCO₂e/m
Fossil only · GWP100 · GWP vintage not stated
FossilBio CH₄Land useBio CO₂EN 15804 GWP-fossilOne value, for any year
Statens vegvesen sets no date window, so there is no year to pick.
Reference year 2026
- Region
- Norway NO
- Boundary
- Cradle to gate
- Data quality
- MediumRated by us, not by the source
- Licence
- Open · Statens vegvesen terms
Where 1,595 comes from
Statens vegvesen prints this factor as a single figure, with no parts to add up and no split by gas.
Reporting this metre under the GHG Protocol
3.2 Equipment 1,595
Bought as a capital good that you keep, it is Scope 3, category 2, counted in the year you buy it.
The factor, standardised
Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.
Buildings and infrastructure › Civil infrastructure · Norway · per m · Generic
Cradle to gate · Fossil only
- BoundaryCradle to gateExtraction of raw materials through production, up to the producer's factory gate. Learn more
- Cradle to gate
- Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging and purchased energy
- GWP methodWhich IPCC assessment report's warming potentials convert each gas to CO₂e, and over how many years the warming is counted (GWP100: 100 years). Learn more
- Not stated by the publisher
- CO₂e basisWhich carbon the CO₂e counts. Fossil only leaves out biogenic methane, land-use change and biogenic CO₂; excl. biogenic CO₂ counts biogenic methane but not the other two; net total counts every pool, net of removals. The same activity on two bases is two different numbers. Learn more
- Fossil onlyFossilBio CH₄Land useBio CO₂EN 15804 GWP-fossil
- Not split by gas; CO₂e only
- Life cycle
- Upstream: coveredProduction: coveredDownstream: not coveredEnd of life: not covered
Medium quality · Open licence · Any year
What this number covers
What Statens vegvesen counts in the figure for 1 m, phase by phase.
Upstream
- Transport to the plant
- Raw materials
- Fuel supply chain
IncludedProduction
- Fuel combustion
- Manufacturing
- Packaging
- Purchased electricity and heat
IncludedYour record
1 m in your records. The factor is per m.
= 1,595
Outside this boundary
- Installation
- Maintenance
- Transport to the border
- Retail
- Use
- End of life
- Recycling credit
Statens vegvesen does not count any of this in the figure for 1 m.
From Statens vegvesen's record to a comparable factor
Statens vegvesen publishes this factor as one record. Here is each field as printed and what open-climate.ai made of it.
About this factor
From Statens vegvesen
Early-phase tool, railwaySource and licence
- Publisher
- Statens vegvesen (Norwegian Public Roads Administration)
- Library
- Statens vegvesen v6.03
- Record
- 425
- Published
- 11 February 2026
The values and their metadata are served in full and may be reused with credit to the publisher.
Cite this factor
Kilde: Statens vegvesen, VegLCA v6.03. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/statens_vegvesen/ (CC BY 4.0). https://open-climate.ai/factors/ef-statensvegvesen-bane_overbygning_og-no-m-cradle_to_gate-fb11c958/?v=efv1-de76d90df5ad5fc3e3b9b8cfd172ee65
Something looks wrong?
Tell us which value and why. We check it against the source and answer within a week.
Page data as of .