Civil infrastructure emission factors
Civil engineering works: roads, bridges, rail track, pipelines as works. From 5 libraries, filed in one model so one publisher's factor compares with another's.
What the 7 factor pages say
One chart per unit, since a kilogram and a kWh do not compare. Colour is the boundary, what the factor counts; every row also names it.
Per JPY · 4 factor pages
Linear scale, from 0- Transportation structures and highways and streetsCradle to gate0.00523
Open CEDA · Togo · 2025
- Power and communication structuresCradle to gate0.00224
Open CEDA · Canada · 2025
- Transportation structures and highways and streetsCradle to gate0.00136
Open CEDA · Luxembourg · 2025
- Power and communication structuresCradle to gate0.00114
Open CEDA · Hong Kong · 2025
Per CAD
OpenIO-Canada puts Pipelines and other oil and gas engineering works at 0.398 kgCO₂e/CAD (Cradle to gate, 2022), the only factor page in this unit.
Per m
ICM puts Pipeline, natural gas, low pressure distribution network at 99.5 kgCO₂e/m (Cradle to distribution gate, 2015), the only factor page in this unit.
Per m²
ADEME puts Road - TC6 class at 37 kgCO₂e/m² (Cradle to gate, 2019), the only factor page in this unit.
Source: the published factor pages, catalogue version 591.
Who publishes these factors
5 libraries publish them. Each name opens the library's page.
Open CEDA (298) and OpenIO-Canada (134) hold 92% of them; the other 3 publish the rest (39).
- Open CEDA298
- OpenIO-Canada134
- ADEME27
- ICM8
- USEEIO4
Source: open-climate.ai catalogue, version 591, coverage summed over libraries.
Every factor page
Sorted by library. Each factor is also on its library's page.
| Activity | Library | Region | Boundary | Value | Year |
|---|---|---|---|---|---|
| Road - TC6 class | ADEME | France | Cradle to gate | 37 kgCO₂e/m² | 2019 |
| Pipeline, natural gas, low pressure distribution network | ICM | Australia | Cradle to distribution gate | 99.5 kgCO₂e/m | 2015 |
| Power and communication structures | Open CEDA | Canada | Cradle to gate | 0.00224 kgCO₂e/JPY | 2025 |
| Power and communication structures | Open CEDA | Hong Kong | Cradle to gate | 0.00114 kgCO₂e/JPY | 2025 |
| Transportation structures and highways and streets | Open CEDA | Togo | Cradle to gate | 0.00523 kgCO₂e/JPY | 2025 |
| Transportation structures and highways and streets | Open CEDA | Luxembourg | Cradle to gate | 0.00136 kgCO₂e/JPY | 2025 |
| Pipelines and other oil and gas engineering works | OpenIO-Canada | Manitoba | Cradle to gate | 0.398 kgCO₂e/CAD | 2022 |
Other subcategories
- Building construction1,324 factors · 7 pages
Have a procurement file?
Send it and we'll match every line.