Emission factor from Trafikverket v9.0

High beam and tube guardrail ≤ H2

Sweden · Cradle to gate · 2020 onwards

Each metre from 2020 counts as 145 kg CO₂e.

Value from 2020 onwards

145kgCO₂e/m

Biogenic CO₂ and land use excluded · GWP100 · GWP vintage not stated

FossilBio CH₄Land useBio CO₂GHG Protocol and IPCC inventories
2020–
Default: the latest yearUnchanged on –2019
Region
Sweden SE
Boundary
Cradle to gate
Data quality
MediumNo reason given by the publisher
Licence
Open · Trafikverket terms

Where 145 comes from

Published as one number

Trafikverket prints this factor as a single figure, with no parts to add up and no split by gas.

Reporting this metre under the GHG Protocol

3.1 Goods we buy 145

Goods and services you buy are Scope 3, category 1, purchased goods and services.

CiteAPI

The factor, standardised

Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.

Materials › Metals · Sweden · per m · Generic

Cradle to gate · Excl. biogenic CO₂

Boundary
Cradle to gate
Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging and purchased energy
GWP method
Not stated by the publisher
CO₂e basis
Excl. biogenic CO₂FossilBio CH₄Land useBio CO₂GHG Protocol and IPCC inventories
Not split by gas; CO₂e only
Life cycle
Upstream: coveredProduction: coveredDownstream: not coveredEnd of life: not covered

Medium quality · Open licence · 2019 to now

All values

2 values, one per year back to 2019. Every one is biogenic CO₂ and land use excluded, GWP not stated by the publisher, so the years compare directly. Tap a bar.

2020 onwards145Default value

kgCO₂e per m, by year. Pick a year to read it.

What this number covers

What Trafikverket counts in the figure for 1 m, phase by phase.

  1. Upstream

    • Transport to the plant
    • Raw materials
    • Fuel supply chain
    Included
  2. Production

    • Fuel combustion
    • Manufacturing
    • Packaging
    • Purchased electricity and heat
    Included
  3. Your record

    1 m in your records. The factor is per m.

    = 145

Outside this boundary

  • Installation
  • Maintenance
  • Transport to the border
  • Retail
  • Use
  • End of life
  • Recycling credit

Trafikverket does not count any of this in the figure for 1 m.

From Trafikverket's record to a comparable factor

Trafikverket publishes this factor as one record, and a new record every year. Here is each field as printed and what open-climate.ai made of it.

About this factor

From Trafikverket

Average technology of guardrail manufacturers in Sweden. Guardrail accessories are not included in the emission factor but are compensated for in the standard quantity (metres) per standard measure.

Source and licence

Publisher
Trafikverket (Swedish Transport Administration)
Record
105
Published
1 April 2025
Open the record at Trafikverket

The values and their metadata are served in full and may be reused with credit to the publisher.

Credit it with this lineKälla: Trafikverket, Klimatkalkyl version 9.0, Bilaga 1 Effektsamband (2025-04-01)
The publisher's text on this page is translated by open-climate.ai.A plain reading of the licence, not legal advice. The licence text prevails.

Cite this factor

Källa: Trafikverket, Klimatkalkyl version 9.0, Bilaga 1 Effektsamband (2025-04-01). Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/trafikverket/ (CC BY 4.0). https://open-climate.ai/factors/ef-trafikverket-hogt_balk_och_rorracke-se-m-cradle_to_gate-cc2f65be/?v=efv1-f5c50c5d5d84ce3bc085f52428a4c372

Something looks wrong?

Tell us which value and why. We check it against the source and answer within a week.

Page data as of .