Emission factor from EPD Italy EPD, product-specific

POLIISO® TEGOLA sp. 100 mm (scenario b)

Italy · EPD total · Reference year 2024

Each square metre of this product counts as 34.7 kg CO₂e over the modules its EPD declares: 25.8 to make it (A1–A3) and 8.92 at end of life.

Value per square metre, over the modules the EPD declares

34.7kgCO₂e/m²

EN 15804 modules A1 to A3 · Net total: fossil, biogenic and land use · GWP100 · AR5

Derived by open-climate.ai: the sum of EPD Italy's published parts

The one scenario this EPD declaresReference year 2024

Region
Italy IT
Boundary
EPD total
Data quality
High
Licence
Open · EPD Italy terms
Declared by
Ediltec Insulation S.pA.

Where 34.7 comes from

  • A1-A3 Product stageDerived by open-climate.ai
    Scope 3, cat. 225.874.3%
  • End of lifeDerived by open-climate.ai
    Scope 3, cat. 58.9225.7%
Derived by open-climate.ai

Σ 34.7: the two declared modules add up to the total.

Reporting this square metre under the GHG Protocol

This period

Scope 3, category 2 25.8

The product becomes part of a building you own. The product and its installation go to category 2 in the year you buy it, the delivery to category 4. Use and end of life are reported in the years they happen.

Later, when it happens

At end of life, in the year of demolition

  • End of life Scope 3, category 5 8.92

A4, A5, B1 to B7 and C1 to C4 are not declared: nothing to report.

CiteAPI

The factor, standardised

Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.

Materials › Construction products · Italy · per m² · Supplier-specific

EPD total · Net total · AR5

Boundary
EPD total
Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging, purchased energy and end of life
GWP method
IPCC AR5, 100-year horizon
Not on the record; set from EPD Italy's method notes · impact method EF 3.0
CO₂e basis
Net total
Not split by gas; CO₂e only
Life cycle
Upstream: coveredProduction: coveredDownstream: not coveredEnd of life: partly covered

High quality · Open licence · Any year

Module by module, up to the total

Seventeen EN 15804 modules, always in the same order. Each declared one moves the running total.

kgCO₂e per square metre. Each bar starts where the one before ended. Pick a module to read it.
Product
Con­struc­tion
A4 to A5not de­clared
Use
B1 to B7not de­clared
End of life
C1not de­clared
C3not de­clared
Beyond the boundary
Dnot de­clared

What this number covers

Follow one square metre of this product through EN 15804's stages. The total counts what the EPD declares; what it leaves out stays visible.

  1. A1-A3Product

    Materials and making the product

    Included25.8
  2. A4-A5Construction

    Delivery and installation

    Not declared
  3. B1-B7Use

    The product in service: maintenance, repair, replacement and the energy and water it uses

    Not declared
  4. C1-C4End of life

    From demolition to disposal; C1, C3 not declared

    C2, C48.92
  5. DBeyond the boundary

    Recovery after end of life

    Not declared

Outside this boundary

  • Installation
  • Maintenance
  • Outbound transport
  • Retail
  • Use phase
  • Recycling credit

Maintenance is out because B2 is not declared.

Gases

EPD Italy publishes this factor as CO₂e only, with no split by gas. The CO₂e counts fossil, biogenic and land-use carbon together.

From EPD Italy's record to a comparable factor

EPD Italy publishes this EPD as one declared value. Each field as printed, and what open-climate.ai made of it.

The total and its modules

Use a module on its own when you report it in a different year or scope; never add one to the total.

You are here · the EPD total34.7
The two modules add up to the total. Each opens its own page.

About this factor

From EPD Italy

What it is

1 m2 of expanded polyurethane panel Primary and site-specific data (bills of materials, component weights, energy consumption, waste generation, emissions) were provided by Ediltec Insulation Spa with reference to the year 2021. For other data (e.g. transport models and component raw material models) secondary/generic data from the Ecoinvent 3.9.1 database were used. Proxies were used for the composition of some of the raw material inputs, weighing less than 5 %. The impact allocation procedure for recycling follows the ‘LCA Cut-off by classification’ model where impacts are directly assigned to the product generating them. In accordance with the cut-off rules stated in the product-specific requirements, the following exclusions were made from the system boundaries: - Capital goods such as buildings, machinery, tools and infrastructure; - Packaging for internal transport; - General administrative activities (business travel, marketing and advertising etc.) that cannot be allocated directly to the production of the relevant product; - Production, use and disposal of component and semi-finished intermediate packaging; - Constituent materials whose total mass does not exceed 1% of the total weight of the product;

Where it applies

Thermal insulation panel made of rigid, closed-cell PIR foam, expanded between two supports. For Construction application. POLIISO® TEGOLA sp. 60 mm, 80 mm,100 mm,120 mm,140 mm.

Source and licence

Value
Summed by open-climate.ai from its parts
Publisher
EPD Italy (ICMQ)
Published
2 October 2026
Valid until
31 December 2029
See the source data at EPD Italy

The values and their metadata are served in full and may be reused with credit to the publisher.

Credit it with this lineEPD Italy (ICMQ), EPD data from https://epditaly.lca-data.com
A plain reading of the licence, not legal advice. The licence text prevails.

Cite this factor

EPD Italy (ICMQ), EPD data from https://epditaly.lca-data.com. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/epd_italy/ (CC BY 4.0). https://open-climate.ai/factors/ef-epditaly-poliiso_tegola_sp_100_mm-it-m2-epd_total-12628fe9/?v=efv1-82c2ab306f5da8677a8dbc7eeea749db

Something looks wrong?

Tell us which value and why. We check it against the source and answer within a week.