Emission factor from ITB EPD Program (Instytut Techniki Budowlanej) EPD, industry average
HV and SB bolt sets
World · Cradle to grave, embodied · Reference year 2024
Value per kilogram, over the modules the EPD declares
1.34kgCO₂e/kg
EN 15804 modules A1 to A5 · Fossil only · GWP100 · AR5
Derived by open-climate.ai: the sum of ITB EPD's published parts
The one scenario this EPD declaresReference year 2024
- Region
- World GLOBAL
- Boundary
- Cradle to grave, embodied
- Data quality
- MediumRated by us, not by the source
- Licence
- Open · ITB EPD terms
- Declared by
- KOELNER RAWLPLUG IP Sp. z o. o.
- Declared unit
- Served per kilogram ÷ 1,000
Where 1.34 comes from
- A1-A3 Product stageDerived by open-climate.aiScope 3, cat. 11.396.8%
- Scope 3, cat. 40.01661.2%
- A5 InstallationScope 3, cat. 10.003430.3%
- End of lifeDerived by open-climate.aiScope 3, cat. 50.02331.7%
- Outside the scopes−0.55beside
Σ 1.34: the four declared modules add up to the total. D stays beside it.
Reporting this kilogram under the GHG Protocol
This period
Scope 3, category 1 1.3 Scope 3, category 4 0.0166
You buy the product for a building that is not yours. The product and its installation go to category 1, the delivery to category 4. The use stage belongs to the building owner; demolition waste you handle is category 5.
Later, when it happens
At end of life, in the year of demolition
- End of life Scope 3, category 5 0.0233
Outside the scopes, reported separately
- D −0.55
B1 to B7 and C1 to C4 are not declared: nothing to report.
The factor, standardised
Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.
Materials › Metals · World · per kg · Average
Cradle to grave, embodied · Fossil only · AR5
- BoundaryCradle to grave, embodiedThe whole life cycle EXCEPT the use stage: cradle_to_gate plus distribution to site, installation and end-of-life (EN 15804 A1-A3 + A4 + A5 + C1-C4). Learn more
- Cradle to grave, embodied
- Raw materials, inbound transport, fuel supply, fuel combustion, manufacturing, packaging, purchased energy, installation, outbound transport and end of life
- GWP methodWhich IPCC assessment report's warming potentials convert each gas to CO₂e, and over how many years the warming is counted (GWP100: 100 years). Learn more
- IPCC AR5, 100-year horizon
- Not on the record; set from ITB EPD's method notes · impact method EF 3.0
- CO₂e basisWhich carbon the CO₂e counts. Fossil only leaves out biogenic CO₂ and land use; net total counts every pool, net of removals. The same activity on two bases is two different numbers. Learn more
- Fossil only
- Split by carbon origin, not by gas
- Life cycle
- Upstream: coveredProduction: coveredDownstream: partly coveredEnd of life: covered
Medium quality · Open licence · Any year
Module by module, up to the total
Seventeen EN 15804 modules, always in the same order. Each declared one moves the running total. D sits below zero after the total, because it is reported beside it.
beside the total, not in it
| Module | Name | Per kilogram | Per t as declared | Running total | Status |
|---|---|---|---|---|---|
| A1 | Raw material supply | 0.735 | 735 | 0.735 | Declared |
| A2 | Transport to the plant | 0.0869 | 86.9 | 0.8219 | Declared |
| A3 | Manufacturing | 0.475 | 475 | 1.2969 | Declared |
| A4 | Transport to site | 0.0166 | 16.6 | 1.3135 | Declared |
| A5 | Installation | 0.00343 | 3.43 | 1.31693 | Declared |
| B1 | Use | not declared | 1.31693 | Not declared | |
| B2 | Maintenance | not declared | 1.31693 | Not declared | |
| B3 | Repair | not declared | 1.31693 | Not declared | |
| B4 | Replacement | not declared | 1.31693 | Not declared | |
| B5 | Refurbishment | not declared | 1.31693 | Not declared | |
| B6 | Energy in use | not declared | 1.31693 | Not declared | |
| B7 | Water in use | not declared | 1.31693 | Not declared | |
| C1 | Demolition | 0.00137 | 1.37 | 1.3183 | Declared |
| C2 | Waste transport | 0.0166 | 16.6 | 1.3349 | Declared |
| C3 | Waste processing | 0.00516 | 5.16 | 1.34006 | Declared |
| C4 | Disposal | 0.00021 | 0.21 | 1.34027 | Declared |
| Total | EPD total, declared modules | 1.34027 | 1,340.27 | Sum of the declared modules | |
| D | Beyond the system boundary | −0.55 | −550 | not added | Beside the total, not in it |
Scenarios and units
Some EPDs price a module under several scenarios, such as different end-of-life routes. Each gets a tab, and each module's default is marked.
One scenario, as declared
Every module has one value, so there is nothing to choose.
- Per t, as declared1,340.27
- Per kilogram, served1.34027
What this number covers
Follow one kilogram of this product through EN 15804's stages. The total counts what the EPD declares; what it leaves out stays visible.
A1-A3Product
Materials and making the product
Included1.3A4-A5Construction
Delivery and installation
Included0.02B1-B7Use
The product in service: maintenance, repair, replacement and the energy and water it uses
Not declaredC1-C4End of life
From demolition to disposal
Included0.0233DBeyond the boundary
Recovery after end of life
Not in the total−0.55
Outside this boundary
- Maintenance
- Retail
- Use phase
- Recycling credit
Maintenance is out because B2 is not declared. The recycling credit is module D, shown beside the total.
Gases
- Fossil CO₂e1.34
- Biogenic CO₂e−0.00553
- Land-use CO₂e0.00189
The total counts fossil CO₂e. ITB EPD reports biogenic and land-use CO₂e separately; they are shown beside it, not added.
From ITB EPD's record to a comparable factor
ITB EPD publishes this EPD with one value per module. Each field as printed, and what open-climate.ai made of it.
The total and its modules
Use a module on its own when you report it in a different year or scope; never add one to the total.
About this factor
From ITB EPD
What it is
The data selected for LCA originate from ITB-LCI questionnaires completed by Koelner Rawlplug IP Sp. z o. o. and verified during data audit. No data collected is older than five years and no generic datasets used are older than ten years. The representativeness, completeness, reliability, and consistency is judged as very good. The background data for the processes come from the following resources database Ecoinvent v.3.10. Specific (LCI) data quality analysis was a part of the input data verification. The allocation rules used for this EPD are based on general ITB ’s document PCR A. Production of a HV and SB bolt sets is a line process (as presented in Figure 2) conducted in the manufacturing plant located in Lancut (Poland). Input and output data from the production is inventoried and allocated to the production on the mass basis. The declaration covers all types of HV and SB Bolts produced in the plant. Their production resources and processing stages are basically similar, so it is possible to average the production by product weight. In the assessment, all available data from production have been considered, i.e. all raw materials/elements used as per formulation process, utilized thermal energy for heating, and electric power consumption. Thus, material and energy flows contributing less than 1 % of mass or energy have been considered. It can be assumed that the total sum of neglected processes does not exceed 1 % of energy usage and mass per modules A or D. Machines and facilities required during production are neglected. The packaging products (cartoons, foils, wooden pallets, etc.) are included.Where it applies
The manufactured high-strength HV sets for prestressed connections covered by this EPD comply with the requirements of the harmonized EN 14399 and EN 1090-2 standards. The highest quality of HV sets results, among others, from the implemented and rigorously observed production process. The ERP system adapted to the needs assigns a unique number to each production batch. This allows for 100% identification of HV sets and easy access to detailed test results. The system also collects complete information on individual operations, status and their start and end dates. Production is monitored on an ongoing basis and the data is archived. The high quality of the raw material results from the possibility of identifying the steel grade and the melt number used to produce HV sets. The suppliers of wire rod are only renowned steel mills from Europe, guaranteeing that our quality requirements are met. This allows for the flawless execution of the heat treatment process - one of the most important processes for mechanical properties in the entire production of high-strength HV screws. The process is carried out according to the CQI-9 standard, and the correctness of its application is confirmed by the admission of Koelner Rawlplug IP Sp. z o. o. to the elite group of suppliers of the Volkswagen group. The hot-dip galvanizing process is carried out according to the DSV-GAV standards and the ISO 10684 standard. HV sets are available for sale from stock in the range of M12 - M36 - EN, DE.SB screw sets for non-preloaded connections according to EN 15048. SB sets should be installed using controlled torques, the values of which are given in the installation instructions. Installation in accordance with the recommendations significantly increases the self-locking of the connection, thus reducing the risk of the sets unscrewing. Detailed installation guidelines improve work and increase the repeatability of installation, thus increasing the safety of the connection. The recommended installation torques were determined by experts in the company's laboratory, using a Kistler type machine. The tests adopted rigorous requirements for the sets. Among other things, the yield strength and maximum clamping force of the screw connection were tested, as well as resistance to elongation by using a high value of the additional rotation angle. The products are available directly from stock in the M10-M30 range. The factory's products meet the requirements of Regulation (EU) 305/2011 of the European Parliament and of the Council establishing harmonised conditions for the marketing of construction products. All additional technical information about the product is available on the manufacturer's website.Source and licence
- Value
- Summed by open-climate.ai from its parts
- Publisher
- ITB EPD
- Published
- 2 October 2026
- Valid until
- 31 December 2029
The values and their metadata are served in full and may be reused with credit to the publisher.
Cite this factor
ITB EPD Program, programme operator Instytut Techniki Budowlanej (ITB), EPD data from https://itb.lca-data.com. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/itb_epd/ (CC BY 4.0). https://open-climate.ai/factors/ef-itbepd-hv_and_sb_bolt_sets-global-kg-cradle_to_grave_embodied-897e260c/?v=efv1-66e42e28ed317adda2529731751564fc
Something looks wrong?
Tell us which value and why. We check it against the source and answer within a week.