Emission factor from Electricity Info 2005-2024

Electricity - CitizEn

United Kingdom · Upstream fuel · Any year

Each kilowatt-hour bought on this supplier's tariff counts as 0.0109 kg CO₂e for the fuel supplied to the power plants (estimated). open-climate.ai estimated this figure from values published by Electricity Info, for use in any year.

Value for any year

0.0109kgCO₂e/kWh

Market-based · Supplier-specific mix · Fossil only · GWP100 · AR5

FossilBio CH₄Land useBio CO₂EN 15804 GWP-fossil

One value, for any year

Electricity Info sets no date window, so there is no year to pick.

Reference year 2018

Estimated By open-climate.ai, not published by Electricity Info

Region
United Kingdom GB
Boundary
Upstream fuel
Data quality
LowEstimated from a model of the region
Licence
Open · Electricity Info terms

Where 0.0109 comes from

Estimated by open-climate.ai

Electricity Info does not publish this value. open-climate.ai estimated it from Electricity Info's published figures and a regional model.

How it was estimated

Reporting this kilowatt-hour under the GHG Protocol

3.3 Energy upstream 0.0109

Extracting, refining and delivering the fuel behind it happens upstream: Scope 3, category 3.

CiteAPI

The factor, standardised

Every factor on open-climate.ai answers the same questions in the same words, whatever the publisher. Open any ⓘ for the definition.

Electricity › Grid electricity · United Kingdom · per kWh · Average

Upstream fuel · Market-based · Fossil only · AR5

Boundary
Upstream fuel
Fuel supply
Calculation approach
Market-based, supplier-specific mix
GWP method
IPCC AR5, 100-year horizon
Not on the record; set from Electricity Info's method notes
CO₂e basis
Fossil onlyFossilBio CH₄Land useBio CO₂EN 15804 GWP-fossil
Not split by gas; CO₂e only
Life cycle
Upstream: coveredProduction: not coveredDownstream: not applicableEnd of life: not applicable

Low quality · Open licence · Any year

What this number covers

The path of one kilowatt-hour, from the fuel to your meter. Not every step on it is counted; what is left out is listed below.

  1. Fuel supply

    Extracting, processing and transporting the fuel the plants burn

    Included0.0109
  2. Your meter

    1 kWh used. The factor is per kWh measured here.

    = 0.0109

Outside this boundary

  • Burning fuel at the plants
  • Purchased electricity and heat
  • Building the power plants
  • Building the grid

open-climate.ai counts running the plants, not building them.

From Electricity Info's inputs to a comparable factor

Electricity Info publishes the inputs; open-climate.ai estimated this value from them, so no printed record stands beside it.

Checks this factor passed

  • Unit, region, boundary and method mapped to fixed code lists.
How we standardise every library

About this factor

Source and licence

Value
Estimated by open-climate.ai from this source
Publisher
Electricity Info (ElectricityInfo.org)
See the source data at Electricity Info

The values and their metadata are served in full and may be reused with credit to the publisher.

Credit it with this lineElectricity Info (electricityinfo.org): Fuel Mix of UK Domestic Electricity Suppliers, disclosure years 2005-2024
A plain reading of the licence, not legal advice. The licence text prevails.

Cite this factor

Electricity Info (electricityinfo.org): Fuel Mix of UK Domestic Electricity Suppliers, disclosure years 2005-2024. Normalised by open-climate.ai, https://open-climate.ai/factors/libraries/electricity_info_uk/ (CC BY 4.0). https://open-climate.ai/factors/ef-electricityinfou-electricity_citizen-gb-kwh-upstream_fuel-d1a666e9/?v=efv1-2d71d6769279ae7042dfd563bfeb771c

Something looks wrong?

Tell us which value and why. We check it against the source and answer within a week.

Page data as of .