Open CEDA: Electricity
Electricity supply: grid mixes, generation technologies, certified supply, distribution and trade. 3 Open CEDA factors in this category have a page of their own, listed below.
Copyleft licence
- Spend
Factor pages in this section
3
In the library's catalogue
149
of 59,538 in all of Open CEDA
Subcategories
1
Regions
3
Edition
CEDA 2025
The 3 factor pages
Sorted by subcategory. Each factor is also on the page of its category, beside every other library's.
| Activity | Subcategory | Region | Boundary | Value | Year |
|---|---|---|---|---|---|
| Electric power generation, transmission, and distribution | Grid-mix electricity | Bangladesh | Cradle to gate | 0.034 kgCO₂e/JPY | 2025 |
| Electric power generation, transmission, and distribution | Grid-mix electricity | Ukraine | Cradle to gate | 0.0662 kgCO₂e/JPY | 2025 |
| Electric power generation, transmission, and distribution | Grid-mix electricity | Qatar | Cradle to gate | 0.113 kgCO₂e/JPY | 2025 |
The other sections of Open CEDA
Open CEDA has too many factor pages for one page, so each category has its own.
- Services57 factor pages
- Manufactured goods42 factor pages
- Materials41 factor pages
- Food and agriculture24 factor pages
- Transport20 factor pages
- Fuels12 factor pages
- Buildings and infrastructure8 factor pages
- Electricity3 factor pages
- Waste treatment3 factor pages