Incineration emission factors

Incineration of waste, with or without energy recovery. From 10 libraries, filed in one model so one publisher's factor compares with another's.

Factors
446
Libraries
10
With their own page
11
Units with a page
kg · EUR
Largest library

295 factors, 66%

What the 11 factor pages say

One chart per unit, since a kilogram and a kWh do not compare. Colour is the boundary, what the factor counts; every row also names it.

End of lifeCradle to gateCradle to distribution gate

Per kg · 9 factor pages

Log scale: each gridline is 10 times the last
From 0.00465 (Metal - Metal: scrap metal - Combustion, DESNZ) to 3.68 (Disposal, paint remains, 0% water, to hazardous waste incineration, ICM) kgCO₂e per kg. 2 boundaries appear here, so part of the spread is what each factor counts, not a disagreement between publishers.

Per EUR · 2 factor pages

Linear scale, from 0.5
From 0.726 (Intert/metal waste for treatment: incineration, EXIOBASE) to 1.57 (Textiles waste for treatment: incineration, EXIOBASE) kgCO₂e per EUR.

Source: the published factor pages, catalogue version 591.

Who publishes these factors

10 libraries publish them. Each name opens the library's page.

EXIOBASE (295) and EPA Hub (54) hold 78% of them; the other 8 publish the rest (97).

Source: open-climate.ai catalogue, version 591, coverage summed over libraries.

Every factor page

Sorted by library. Each factor is also on its library's page.

ActivityLibraryRegionBoundaryValueYear
Packaging - GlassADEMEFranceEnd of life0.13 kgCO₂e/kg2021
Restafval (met nascheiding) - Finale afvalverwerking (AVI of Bio-energiecentrale met energieterugwinning)CO2emissiefactoren.beBelgiumEnd of life0.048 kgCO₂e/kg2026
RestafvalCO2emissiefactoren.nlNetherlandsEnd of life0.038 kgCO₂e/kg2026
Metal - Metal: scrap metal - CombustionDESNZUnited KingdomEnd of life0.00465 kgCO₂e/kg2026
PVC - CombustedEPA HubUnited StatesEnd of life1.39 kgCO₂e/kg2026
Intert/metal waste for treatment: incinerationEXIOBASEFranceCradle to gate0.726 kgCO₂e/EUR2019
Textiles waste for treatment: incinerationEXIOBASERest of World: America (EXIOBASE)Cradle to gate1.57 kgCO₂e/EUR2019
Disposal, paint remains, 0% water, to hazardous waste incinerationICMAustraliaCradle to distribution gate3.68 kgCO₂e/kg2015
Clinical WasteNGAAustraliaEnd of life0.879 kgCO₂e/kg2025
Incineration domestic wasteÖKOBAUDATGermanyEnd of life0.442 kgCO₂e/kg2023
Incineration polystyrene (PS) in municipal solid waste plant (incl. credits)ÖKOBAUDATGermanyEnd of life3.38 kgCO₂e/kg2023

Other subcategories

Have a procurement file?

Send it and we'll match every line.

Match my file